FORGE: sprints, estimates and metrics

Switching FORGE on for a board, the status track, sprints from planning to finishing, the sprint board, the metrics and the place sprint.

What FORGE is

FORGE is a WORK board with a type per task, a fixed status track, an estimate and sprints switched on. A FORGE task is an ordinary record, with updates, mentions, a page and the archive.

  • Type: Epic · Story · Task · Bug · Spike. A new record starts as an Epic and a new subitem as a Story, unless you choose otherwise.
  • Estimate: points per task.
  • Sprint: a period with a name, a goal and dates (seven days by default), moving from planned to active to closed. One active sprint per board.

Switching FORGE on

  1. On a WORK board: Board actions, FORGE · sprints and epics.
  2. A Type column, the status track and an Estimate column are added, and FORGE appears at the top of the board.

Switched on and off by the account's owners and admins, with owner level on the board. Switching off deletes nothing: the columns and data stay, and the board is an ordinary board again.

The status track

Backlog → Ready → In progress → Review → Done.

  • One step forward at a time. Back to any step. A new record always starts on the first step.
  • In the status picker, a step you cannot reach now is greyed out. A skip is refused, and the message says what the next step is.
  • A record Blocked by another record does not start until the blocking one is completed.

A sprint: plan, start, finish

  1. Sprints (in the board menu or the FORGE tab), New sprint: a name, a goal and dates.
  2. Plan the sprint: add tasks. In the FORGE tab, drag a task from The backlog onto the board, or Move to sprint.
  3. Start (only when no sprint is active).
  4. Finish sprint: the tasks not completed move together to a planned sprint you choose, to a New sprint (its name and dates are suggested), or back to the backlog. Start it right away starts the next one in the same action. Completed tasks stay in the closed sprint.

Sprints are created, started and finished by owners, admins and team managers with edit level on the board. Everyone who reads the board sees the sprints.

The sprint board

The FORGE tab under the board name, beside Main table, is the sprint board.

  • The columns are the steps of the track. Drag a card to the next column to move it forward.
  • A card: the number, the type, Blocked when a record blocks it, the Checklist bar (for example 3/5), the owner and the points.
  • New item at the bottom of the first column: a name and Enter. The record is created as a Task, on the first step, in the active sprint.
  • The backlog at the side of the board: open records not in a sprint. Drag a card from the board to the backlog to take it out of the sprint.
  • The checklist in the record panel (Details): every line is a subitem. A line is ticked when it is in Review, and a line on an earlier step shows Next step.

The metrics

  • Current sprint at the top of the sprint board: the name, the dates, the load (how many points are done out of those planned, as a bar) and the number of records. The load always counts every record of the sprint, even when the board is filtered.
  • In the table: the total estimate at the end of each group, and Σ beside a record with subitems, the total of their estimates.
  • Sprints: each sprint with its state (planned, active, closed), dates and estimate. A sprint is never deleted, so the numbers of earlier sprints remain.
  • My picture on the home also shows the active sprint.

The place sprint

In a place where it was switched on, FORGE has its own part in the switch: a place sprint, which gathers records from every board and from VISION, without copying them.

  • FORGE in the switch, New sprint. The name, dates and product manager are suggested. Create the sprint opens its board, with The backlog of every board you see beside it.
  • Four columns: Backlog · In progress · In review · In production. Dragging changes the status on the record's own board, by the same one-step-at-a-time rule.
  • In production needs evidence: a PR link, a deployment link or a browser check, with an https link. The product manager may move a card without evidence, with a reason recorded in the log.
  • The bar at the top: points out of the capacity, and No estimate: N. Only mine, By board and By type filter.
  • People (in ⋯ More): a Product manager, a Team and Stakeholders, by person or by role.

Everyone sees on the sprint board only records of boards they may open. A record is in one live sprint only.

Limits

  • On the free tier up to 20 sprints per board, closed sprints included.
  • Only a top-level record joins a sprint, not a subitem. The estimate rolls up one level: from subitems to the record.
  • Place sprint: up to 5 active at once, up to 500 records per sprint, up to 50 people and up to 20 pieces of evidence per record.
  • Not available yet: a calendar with a sprint strip, a timeline with dependencies and a summary view.

Updated: 04.11.2026 · A question this page did not answer? support@dils.co.il